AVAILABILITY AND WORK TARGETS OF BULLDOZERS

Authors

  • A.H. Kalro Indian Institute of Management, Ahmedabad Author
  • Girija Sharan Indian Institute of Management, Ahmedabad Author
  • M. Krishna Kumar Indian Institute of Management, Ahmedabad Author

DOI:

https://doi.org/10.52151/

Abstract

Setting work targets for machines is an important task for engineering managers. especially where they operate large fleets with machines of different makes and ages. Setting uniform work targets is easier but it does not take into account operating characteristics of machines which could differ with make and change with age. It is suggested here that using analysis of availability of machines can provide an alternate basis to set work targets. Availability analysis of bulldozers is reported here which suggests the feasibility of achieving higher work targets compared to the present 1000 hours per season.

Downloads

Download data is not yet available.

References

Kapoor, K.C. -and L.R. Lamberson 1977. Reliability in Engineering Design. John Wiley.

Medhi, J. 1982. Stochastic Process’s. Wiley Eastern.

Cox, D.R. and H.D. Miller. 1968. The theory of stochastic process. John Wiley.

Published

2024-08-03

Issue

Section

Regular Issue

How to Cite

A.H. Kalro, Girija Sharan, & M. Krishna Kumar. (2024). AVAILABILITY AND WORK TARGETS OF BULLDOZERS. Journal of Agricultural Engineering (India), 30(1-4), 13-21. https://doi.org/10.52151/